Wednesday, May 09, 2007

Renovation (Week 6)

This week started off with quite a big change. On Monday I scootered to the house during lunch to see what what up (since I don't currently have a way to get into the house outside of working hours). When I got there the front steps were covered with tarps as the roofers were just about to strip the roof. While I was inside the house stuff was falling down on both sides of the house at a massive rate. When I left 45 minutes later there was no roof.







I also noticed that the holes had been cut in the floors for the new vents and the opening between the dining room and the hallway had been expanded.





Today I went back during lunch and much to my surprise the roof was completely finished. It's amazing how fast those roofers much have worked.



Also, most of the electrical work has been finished. There are electrical wires everywhere.





In the basement they've installed the new electrical panel (with dedicated switches for high voltage things like microwaves).



But the thing that really makes me smile is the new punchdown block.



Thing is where all of the networking cables will terminate, and will be where I hook up my server and all of my networking gear. There's even a nice little niche in the wall for my server.

The rest of my photos from this week can be found here.